Latest News Headlines

EXTREME Support with MILOS Ultra High-Strength Steel

EXTREME Support with MILOS Ultra High-Strength Steel
EXTREME Support with MILOS Ultra High-Strength Steel

For more than 25 years, MILOS has produced high quality aluminium truss for some of the world’s leading live event production companies. In 2017, the company utilised its truss manufacturing and design knowledge to create an entirely new line of truss that was launched in 2018 – MILOS Steel Truss – which satisfies the ever increasing loading requirements of leading live events across the globe

Introducing the MILOS PA Delay Tower, MILOS LED Screen Support Structure and MILOS Pitched Roof: all three structures are made with Ultra High-Strength Steel that takes loading to the extreme!

Key features of the MILOS Steel Truss range:

  • Full line of tower and ground support components (steel base with outriggers, sleeve blocks, head-section and the locking unit for securing the sleeve block against drop and lift)

  • Greatly increased span lengths (up to 60m free spans) and loading capacities compared to aluminium truss

  • Special steel alloy that provides nearly four times more strength compared to standard S235 Steel

  • Integrated forklift pockets for convenient transport

  • Durable, industrial black paint finish as standard on all truss and tower sections

The MILOS PA Delay Tower provides extreme loading capacity for safely flying your super heavy PA systems without guy wires.

Wind loading of secured structure is up to 28m/second.

Due to the use of integrated steel base with outriggers (3m outriggers at front/back and 2m on each side), combined with the significant self-weight of the tower (70kg/metre), no ballast, or on;y a very small amount of ballast, is required (maximum of 2t).

Safely and securely support the extreme weight of a large LED displays with the MILOS Steel Truss LED Screen Gate. The same tower setup as the PA Delay Tower above can be used to create an LED Gate, which does not require the use of guy wires.

The wind loading of secured structure up to 28m/second

The ballast base footprint is the same as with the PA Delay Towers, which use of a 1m x 1m steel base with 3m front/back and side outriggers. No external outriggers are necessary. Length of inner outriggers that interconnect the two towers depends on length of the LED Wall.

At the free end of the 2m cantilever arm at the top of the tower, an advertising element can be attached. Due to the design of the gate, this element does not have to be dismantled when the gate is not in use.

Experience the ultimate support for the largest and most demanding shows with the MILOS Steel Truss Pitched roof. Extreme loading that only Ultra High-Strength Steel can deliver!

www.milossystems.com/products/steel-truss

23rd September 2019

© 1999 - 2020 Entertainment Technology Press Limited News Stories